Optimization (Pre–ATP) Data Sheets – continued
A-2 1X SC 4812T Lite BTS Optimization/ATP FEB 2005
PRELIMINARY
Site Checklist
Table A-2: Site Checklist
OK Parameter Specification Comments
Deliveries Per established
procedures
Floor Plan Verified
Inter Frame Cables:
Ethernet
Frame Ground
Power
Per procedure
Per procedure
Per procedure
Factory Data:
BBX
Test Panel
RFDS
Per procedure
Per procedure
Per procedure
Site Temperature
Dress Covers/Brackets
Preliminary Operations
Table A-3: Preliminary Operations
OK Parameter Specification Comments
Frame ID DIP Switches Per Site
Equipage
Ethernet LAN
Verification
Verified per
procedure
Comments:_________________________________________________________