- Chapter 4: Acceptance Test Procedures
- Automated Acceptance Test Procedure
- Acceptance Tests - Test Set-up
- Abbreviated (All-inclusive) Acceptance Tests
- Individual Acceptance Tests
- TX Spectral Purity Transmit Mask Acceptance Test
- TX Waveform Quality (Rho) Acceptance Test
- TX Pilot Time Offset Acceptance Test
- TX Code Domain Power/Noise Floor Acceptance Test
- RX FER Acceptance Test
- Generating an ATP Report
- Updating Calibration Data Files
- Chapter 5: Prepare to Leave the Site
- Chapter 6: Troubleshooting
- Basic Troubleshooting: Overview
- Troubleshooting: Installation
- Cannot Log into Cell-Site
- Force LAN A Active (LMF Connection at I/O Panel LAN Connector)
- Force LAN A Active (LMF Connection at Service Shelf LAN Connector)
- Set the GLI IP Address
- Cannot Communicate with Power Meter
- Cannot Communicate with Communications System Analyzer
- Cannot Communicate with Signal Generator
- Troubleshooting: Download
- Troubleshooting: Calibration
- Basic Troubleshooting: RF Path Fault Isolation
- Troubleshooting: Transmit ATP
- Troubleshooting: Receive ATP
- Troubleshooting: CSM Checklist
- Troubleshooting: SCCP Backplane
- Troubleshooting: RFDS
- Module Front Panel LED Indicators and Connectors
- Troubleshooting: Span Control Link
- Appendix A: Data Sheets
- Appendix B: PN Offset/I & Q Offset Register Programming Information
- Appendix C: FRU Optimization / ATP Test Matrix
- Appendix D: BBX Gain Set Point vs. BTS Output
- Appendix E: CDMA Operating Frequency Programming Information
- Appendix F: Test Equipment Preparation
- Test Equipment Preparation
- Verifying and Setting GPIB Addresses
- Agilent E4406A Transmitter Tester GPIB Address
- Agilent E4432B Signal Generator GPIB Address
- Advantest R3267 Spectrum Analyzer GPIB Address
- Advantest R3562 Signal Generator GPIB Address
- Agilent 8935 Series E6380 (formerly HP 8935) Test Set GPIB Address
- Hewlett Packard HP 8921A and HP83236A/B GPIB Address
- Advantest R3465 Communications Test Set GPIB Address
- Motorola CyberTest GPIB Address
- HP 437 Power Meter GPIB Address
- Gigatronics 8541C Power Meter GPIB Address
- RS232 GPIB Interface Adapter
- Test Equipment Inter-Unit Connection, Testing, and Control
- Inter-Unit Connection, Testing, and Control Settings
- HP 8921A with PCS Interface Test Equipment Connections
- HP 8921A with PCS Interface System Connectivity Test
- Pretest Set-up for HP 8921A
- Pretest Set-up for Agilent 8935
- Advantest R3465 Connection
- R3465 GPIB Clock Set-up
- Pretest Set-up for Advantest R3465
- Agilent 8932/E4432B Test Equipment Interconnection
- Agilent E4406A/E4432B Test Equipment Interconnection
- Advantest R3267/R3562 Test Equipment Interconnection
- Equipment Calibration
- Manual Cable Calibration
- Appendix G: Downloading ROM Code
- Appendix H: In-Service Calibration
- Appendix I: Packet Backhaul Configuration
- BTS Router Initial Configuration
- Terminal Setup
- Downloading Minimum Canned BTS Router Configuration Files
- Verifying IOS Canned Version of the CF Memory Card
- Replacing Installed BTS Router CF Memory Card IOS Version
- Background
- Equipment and Software Required for Verification Methods
- Required Publications
- Method 1: Replacement of Installed Router CF Card IOS Data
- Method 2: Using a CF Memory Card Reader for Replacement of Installed IOS Version and Changing File Sequence ...
- Change CF Memory Card File Sequence to Place IOS File First on the Card
- Verify and Upgrade ROMMON Version
- Recovery from BTS Router Boot to ROMMON
- Entering or Changing Router FE Interface IP Address
- Preparation for Site Turn-over
- Index
Automated Acceptance Test Procedure – continued
4-2 1X SC 4812T Lite BTS Optimization/ATP FEB 2005
PRELIMINARY
In the unlikely event that the BTS passes these tests but has a Forward
Link problem during normal operation, the CFE should then perform the
additional TX Tests for troubleshooting: TX Spectral Mask, TX Rho,
and TX Code Domain.
ATP Test Options
ATP Tests can be run individually or as one of the following groups:
S All TX: TX Tests verify that the performance of the BTS Transmit
Elements. These include the GLI, MCC, BBX, Trunking Modules, the
LPA Modules, and passive components including Splitters,
Combiners, Bandpass Filter(s), and RF Cables.
S All RX: The RX Test verifies the performance of the BTS Receive
Elements. These include the MPC, EMPC (for Companion Frames),
BBX, MCC, GLI Cards, and the passive components including RX
Filters and RF Cables.
S All TX/RX: Executes all TX and RX Tests.
S Full Optimization: Executes the TX Calibration, downloads BLO,
and executes the TX Audit before running all TX and RX Tests.
ATP Prerequisites
Before attempting to run any ATP Tests, ensure that the following have
been completed:
S BTS has been optimized (BBX Cards calibrated and BLOs
downloaded) (Chapter 3)
S The carrier(s) and/or sector(s) to be tested have been taken out of
service at the CBSC.
S LMF is logged into the BTS.
S CSM Cards, GLI Cards, BBX Cards, MCC Cards and TSU (if the
RFDS is installed) have correct code and Data Loads.
S Primary CSM and GLI are INS_ACTIVE (bright green).
S MCC Cards are INS_ACTIVE (bright green).
S No BBX Cards are keyed (transmitting).
S BBX Cards are OOS_RAM (yellow).
S Test Cables are calibrated.
S Test Equipment has been selected, warmed–up 60 minutes, and
calibrated.
S GPIB is on.
S BTS Transmit Connectors are properly terminated for the test(s) to be
performed.