User's Manual

Table Of Contents
Index – continued
FEB 2005 1X SC 4812T Lite BTS Optimization/ATP Index-9
PRELIMINARY
Transmit TX path calibration, 3-115
Troubleshooting
DC Power Problems, 6-26
RF path fault isolation, 6-13
Set span configuration, 6-43
span problems, 6-41
TX and RX Signal Routing, 6-27
TX level accuracy fault isolation, 6-16
troubleshooting
communications system analyzer communication,
6-6
Ethernet LAN, 6-3
GLI IP address, 6-4
LMF login failure, 6-2
power meter communication, 6-5
signal generator communication, 6-6
TSU NAM, programming
description, 3-130
parameter ranges, 3-131
parameters, 3-130
procedure, 3-136
TX
acceptance tests
code domain power/noise floor, 4-20
equipment setup, 4-4
pilot time offset, 4-18
spectral purity mask, 4-13
spectrum analyzer display, 4-15
waveform quality (rho), 4-16
all inclusive TX ATP test, 4-6
antenna VSWR, test data sheets, A-9 , A-10
BLO test data sheets, A-7
level accuracy fault isolation, 6-16
output acceptance tests
code domain power noise, 4-11
pilot time offset, 4-11
waveform quality, 4-11
TX and RX Frequency vs Channel , E-2
TX and RX Signal Routing, SCCP Backplane
Troubleshooting, 6-27
TX Audit Test, 3-123
TX calibration, 3-118
All Cal/Audit, 3-119
set–up, 3-64 , 3-84
Advantest R3267, 3-66 , 3-86 , H-21
Advantest R3465, 3-65 , 3-85
Agilent 8935, 3-64 , 3-84
Agilent E4406A, 3-66 , 3-86 , H-21
CyberTest, 3-64 , 3-84
HP 8921A, 3-65 , 3-85
tx fine adjust, B-1
TX path. See transmit path
TX path calibration, 3-118
TX/RX OUT Connections, 4-3
U
Updating Calibration Data Files
Copy and Load Cal File to to CBSC, 4-26
Software Release caveats, 4-26
UTP, LMF to BTS connection, 3-18
V
verification during calibration, 3-110
Verify
test equipment used, test data sheets, A-1
TX output, 4-5
Verify GLI ROM code load, 3-38
W
Waveform quality (Rho), acceptance test procedure,
4-16
X
XCVR Backplane Troubleshooting, 6-22
Xircom Model PE3–10B2, LMF to BTS connection,
3-18