User's Manual

Table Of Contents
Index – continued
FEB 2005 1X SC 4812T Lite BTS Optimization/ATP Index-7
PRELIMINARY
offset usage, B-1
PN offset per sector, B-1
PN Offset Usage , B-1
power, removal, 2-15
DC power, 2-15
Power Delta Calibration
Advantest, H-15
Agilent 8935, H-10
HP8921A, H-12
Power Input, 6-22
Power Meter, setting GPIB address, HP437B, F-16
Power meter, TX acceptance tests, 4-4
Power Supply Module Interface, 6-22
Pre–calibration, HP 437, F-31
Pre–power tests, test data sheets, A-3
Preliminary operations
cell Site types, 2-1
test data sheets, A-2
Prepare to Leave the Site
External Test Equipment Removal, 5-3
Final Checks before leaving site, 5-5
LMF Removal, 5-4
Re–connect BTS T1/E1 Spans, 5-5
Prerequisites, automated acceptance tests, 4-2
Procedures to Copy CAL Files From Diskette to the
CBSC, 4-26 , 6-8 , 6-9
Procedures to Copy Files to a Diskette, 4-26
Pseudorandom Noise. See PN
PWR/ALM and ACTIVE LEDs, MCC–8/24E Card,
6-38
PWR/ALM LED
BBX, 6-36
CSM, 6-31
DC/DC Converter, 6-30
generic, 6-30
MCC–8/24E Card, 6-37
R
RAM code, described, 3-36
receive path
calibration, 3-109
component verification, 3-110
definition, 3-109
Reduced ATP, 4-1
Report generation, ATP report, 4-25
Required test equipment
communications system analyzer, 1-8
digital multimeter, 1-9
directional coupler, 1-9
GPIB cables, 1-9
high–impedance conductive wrist strap, 1-10
RF adapters, 1-10
RF attenuator, 1-9
RF load, 1-10
RS232 to GPIB interface, 1-7
timing reference cables, 1-9
Required Test Equipment and Software, 1-5 , 1-6 ,
1-7
RESET Pushbutton, GLI, 6-35
RF
attenuator, 1-9
Circular – optional test equipment, 1-11
load for required test equipment, 1-10
required test equipment load, 1-10
test cable, 1-10
RF path, fault isolation, 6-13
RF path calibration. See Bay Level Offset calibration
RFDS – Fault Isolation, 6-28
RFDS calibration
description, 3-134
procedure, 3-135
RFDS Location, 1-26
RFDS parameters, 3-126
checking, 3-127
setting, 3-127
RFDS Test Subscriber Unit, 3-37
RFDS TSU Calibration Channel Frequencies, 3-134
Rho
TX waveform quality acceptance test, 4-16
waveform quality requirements, 4-16
ROM code
described, 3-36
downloading, G-1
procedure, G-2
RS232 GPIB Interface Box, F-18
RS232 to GPIB interface
modifications required for Automated Testing, 1-7