User's Manual
Table Of Contents
- Chapter 4: Acceptance Test Procedures
- Automated Acceptance Test Procedure
- Acceptance Tests - Test Set-up
- Abbreviated (All-inclusive) Acceptance Tests
- Individual Acceptance Tests
- TX Spectral Purity Transmit Mask Acceptance Test
- TX Waveform Quality (Rho) Acceptance Test
- TX Pilot Time Offset Acceptance Test
- TX Code Domain Power/Noise Floor Acceptance Test
- RX FER Acceptance Test
- Generating an ATP Report
- Updating Calibration Data Files
- Chapter 5: Prepare to Leave the Site
- Chapter 6: Troubleshooting
- Basic Troubleshooting: Overview
- Troubleshooting: Installation
- Cannot Log into Cell-Site
- Force LAN A Active (LMF Connection at I/O Panel LAN Connector)
- Force LAN A Active (LMF Connection at Service Shelf LAN Connector)
- Set the GLI IP Address
- Cannot Communicate with Power Meter
- Cannot Communicate with Communications System Analyzer
- Cannot Communicate with Signal Generator
- Troubleshooting: Download
- Troubleshooting: Calibration
- Basic Troubleshooting: RF Path Fault Isolation
- Troubleshooting: Transmit ATP
- Troubleshooting: Receive ATP
- Troubleshooting: CSM Checklist
- Troubleshooting: SCCP Backplane
- Troubleshooting: RFDS
- Module Front Panel LED Indicators and Connectors
- Troubleshooting: Span Control Link
- Appendix A: Data Sheets
- Appendix B: PN Offset/I & Q Offset Register Programming Information
- Appendix C: FRU Optimization / ATP Test Matrix
- Appendix D: BBX Gain Set Point vs. BTS Output
- Appendix E: CDMA Operating Frequency Programming Information
- Appendix F: Test Equipment Preparation
- Test Equipment Preparation
- Verifying and Setting GPIB Addresses
- Agilent E4406A Transmitter Tester GPIB Address
- Agilent E4432B Signal Generator GPIB Address
- Advantest R3267 Spectrum Analyzer GPIB Address
- Advantest R3562 Signal Generator GPIB Address
- Agilent 8935 Series E6380 (formerly HP 8935) Test Set GPIB Address
- Hewlett Packard HP 8921A and HP83236A/B GPIB Address
- Advantest R3465 Communications Test Set GPIB Address
- Motorola CyberTest GPIB Address
- HP 437 Power Meter GPIB Address
- Gigatronics 8541C Power Meter GPIB Address
- RS232 GPIB Interface Adapter
- Test Equipment Inter-Unit Connection, Testing, and Control
- Inter-Unit Connection, Testing, and Control Settings
- HP 8921A with PCS Interface Test Equipment Connections
- HP 8921A with PCS Interface System Connectivity Test
- Pretest Set-up for HP 8921A
- Pretest Set-up for Agilent 8935
- Advantest R3465 Connection
- R3465 GPIB Clock Set-up
- Pretest Set-up for Advantest R3465
- Agilent 8932/E4432B Test Equipment Interconnection
- Agilent E4406A/E4432B Test Equipment Interconnection
- Advantest R3267/R3562 Test Equipment Interconnection
- Equipment Calibration
- Manual Cable Calibration
- Appendix G: Downloading ROM Code
- Appendix H: In-Service Calibration
- Appendix I: Packet Backhaul Configuration
- BTS Router Initial Configuration
- Terminal Setup
- Downloading Minimum Canned BTS Router Configuration Files
- Verifying IOS Canned Version of the CF Memory Card
- Replacing Installed BTS Router CF Memory Card IOS Version
- Background
- Equipment and Software Required for Verification Methods
- Required Publications
- Method 1: Replacement of Installed Router CF Card IOS Data
- Method 2: Using a CF Memory Card Reader for Replacement of Installed IOS Version and Changing File Sequence ...
- Change CF Memory Card File Sequence to Place IOS File First on the Card
- Verify and Upgrade ROMMON Version
- Recovery from BTS Router Boot to ROMMON
- Entering or Changing Router FE Interface IP Address
- Preparation for Site Turn-over
- Index
Index – continued
Index-6 1X SC 4812T Lite BTS Optimization/ATP FEB 2005
PRELIMINARY
LAN connectors, external, 2-1 , 2-2 , 2-3 , 2-5
LAN termination, 2-5
LED, CSM, 3-45
LED Status Combinations for all Modules except
GLI2 CSM BBX2 MCC24 MCC8E, 6-30
LIF, Load Information File, 3-9
LMF, F-19 , F-24
1X FER acceptance test, 4-4
1X upgrade preparation, home directory, 3-9
BTS connection, 3-18
platform requirements, 1-6
to BTS connection, 3-16 , 3-17
TX acceptance tests, 4-4
view CDF information, 3-5
LMF BTS displays, 3-19
LMF computer and software, 1-6
LMF Removal, 5-4
Load Information File, 3-9
Local Maintenance Facility. See LMF
Logging Into a BTS, 3-25
Logging Out, 3-30
Logical BTS, 1-16
Numbering, 1-17
LPA errors, 6-10
LPA Module LED, 6-39
LPA Shelf LED Status Combinations, 6-39
M
MASTER LED, GLI, 6-34
MCC LED Status Combinations, 6-37
MMI common connections, 3-32
MMI Connector
CSM, 6-32
GLI, 6-35
MMI Connectors, MCC–8, 6-38
MMI equipment setup, 3-32
Module status indicators, 6-30
Motorola CyberTest GPIB Address, F-15
Multi Channel Card. See MCC
Multi–FER test Failure, 6-19
N
NECF, 3-4
New installations, 1-4
No AMR control, 6-25
No BBX2 control in the shelf, 6-25
No DC input voltage to Power Supply Module, 6-26
No DC voltage +5 +65 or +15 Volts to a specific
GLI2 BBX2 or Switch board, 6-27
No GLI2 Control through span line connection, 6-24
No GLI2 Control via LMF, 6-24
No or missing MCC24 channel elements, 6-25
No or missing span line traffic, 6-25
North American, cellular telephone system frequency
spectrum, CDMA allocation, E-4
O
Online Help, 3-32
optimization/ATP, test set–up
HP 8921A, 800 MHz, H-22
HP 8921A, 1.9 GHz, H-22
Optional test equipment, 1-10
10 MHz rubidium standard, 1-11
2–way splitter, 1-11
CDMA subscriber mobile or portable
radiotelephone, 1-11
duplexer, 1-10
frequency counter, 1-10
LAN tester, 1-11
oscilloscope, 1-11
RF circular, 1-11
RF test cable, 1-11
spectrum analyzer, 1-10
Oscilloscope, optional test equipment, 1-11
P
PCMCIA, Ethernet adapter, LMF to BTS connection,
3-18
Periodic optimization, 1-4
Pilot Time Offset. See PN
Pilot time offset, acceptance test, 4-18
Pin/Signal Information for ARM A Cable, 3-147
Ping, 3-33
PN
offset programming information, B-1