User's Manual

Table Of Contents
Index – continued
FEB 2005 1X SC 4812T Lite BTS Optimization/ATP Index-5
PRELIMINARY
forward link problem after passing reduced ATP, 6-17
Frame, equipage preliminary operations, 2-1
FREQ Monitor Connector, CSM, 6-32
Frequency counter, optional test equipment, 1-10
G
Gain set point, D-1
Generating an ATP Report, 4-25
General optimization checklist, test data sheets, A-4
Gigatronics 8541C Power Meter GPIB Address, F-17
Gigatronics 8542 power meter, calibration, F-33
GLI Connector, 6-22
GLI Ethernet A and B Connections, 6-22
GLI LED Status Combinations, 6-33
GLI Pushbuttons and Connectors, 6-35
GPIB, F-19 , F-22 , F-24
cables, 1-9
set address, HP 437B, F-16
GPIB Address
Advantest R3267, F-8
Advantest R3465, F-14
Advantest R3562, F-9
Agilent (formerly HP) 8935, F-10
Agilent E4406A, F-5
Agilent E4432B, F-7
Gigatronics 8541C Power Meter, F-17
Hewlett Packard HP8921a & HP83236A/B, F-12
Motorola CyberTest, F-15
GPIB Addresses, 3-96
GPIB Interface Box, RS232, F-18
GPS, receiver operation, test data sheets, A-5
GPS Initialization/Verification
estimated position accuracy, 3-50
surveyed position accuracy, 3-50
GPS satellite system, 3-41
Graphical User Interface, 3-20
Group Line Interface. See GLI
GUI, 3-20
H
Hardware Requirements, 1-6
Hewlett Packard HP8921A and HP83236A/B GPIB
Address, F-12
High Stability 10 MHz Rubidium Standard, optional
test equipment, 1-11
High–impedance conductive wrist strap, required test
equipment, 1-10
HP 437
Pre–calibration, F-31
setting GPIB address, F-16
HP 83236A, F-22
HP 8921A PCS interface, Cables Connection for 10
MHz Signal and GPIB , F-20 , F-21
HP8921A, F-22
Test equipment connections , F-19
HSO Initialization/Verification, 3-47
Huber & Suhner, required test equipment, 1-9
HyperTerminal, Creating named HyperTerminal
connection, 3-13
HyperTerminal , create named connection, 3-13
I
I and Q values, B-1
In–Service Calibration, H-23
preliminary Agilent test equipment set–up, H-3 ,
H-6
test set–up diagrams
DRDC, Advantest, 3-71 , 3-91
TRDC, Advantest, 3-73 , 3-93
Initial HP8921A setup, F-35
Initial Installation of Boards/Modules, preliminary
operations, 2-2
Initial power tests, test data sheets, A-3
Initial power–up, BTS frame, 2-12
Intermediate file, generate ATP file using, 4-25
Internal Assemblies and FRUs, 1-18
IP Addresses, Agilent E7495A, 3-96
IS–97 specification, B-1
L
LAN, optional test equipment, 1-11