User's Manual
Table Of Contents
- Chapter 4: Acceptance Test Procedures
- Automated Acceptance Test Procedure
- Acceptance Tests - Test Set-up
- Abbreviated (All-inclusive) Acceptance Tests
- Individual Acceptance Tests
- TX Spectral Purity Transmit Mask Acceptance Test
- TX Waveform Quality (Rho) Acceptance Test
- TX Pilot Time Offset Acceptance Test
- TX Code Domain Power/Noise Floor Acceptance Test
- RX FER Acceptance Test
- Generating an ATP Report
- Updating Calibration Data Files
- Chapter 5: Prepare to Leave the Site
- Chapter 6: Troubleshooting
- Basic Troubleshooting: Overview
- Troubleshooting: Installation
- Cannot Log into Cell-Site
- Force LAN A Active (LMF Connection at I/O Panel LAN Connector)
- Force LAN A Active (LMF Connection at Service Shelf LAN Connector)
- Set the GLI IP Address
- Cannot Communicate with Power Meter
- Cannot Communicate with Communications System Analyzer
- Cannot Communicate with Signal Generator
- Troubleshooting: Download
- Troubleshooting: Calibration
- Basic Troubleshooting: RF Path Fault Isolation
- Troubleshooting: Transmit ATP
- Troubleshooting: Receive ATP
- Troubleshooting: CSM Checklist
- Troubleshooting: SCCP Backplane
- Troubleshooting: RFDS
- Module Front Panel LED Indicators and Connectors
- Troubleshooting: Span Control Link
- Appendix A: Data Sheets
- Appendix B: PN Offset/I & Q Offset Register Programming Information
- Appendix C: FRU Optimization / ATP Test Matrix
- Appendix D: BBX Gain Set Point vs. BTS Output
- Appendix E: CDMA Operating Frequency Programming Information
- Appendix F: Test Equipment Preparation
- Test Equipment Preparation
- Verifying and Setting GPIB Addresses
- Agilent E4406A Transmitter Tester GPIB Address
- Agilent E4432B Signal Generator GPIB Address
- Advantest R3267 Spectrum Analyzer GPIB Address
- Advantest R3562 Signal Generator GPIB Address
- Agilent 8935 Series E6380 (formerly HP 8935) Test Set GPIB Address
- Hewlett Packard HP 8921A and HP83236A/B GPIB Address
- Advantest R3465 Communications Test Set GPIB Address
- Motorola CyberTest GPIB Address
- HP 437 Power Meter GPIB Address
- Gigatronics 8541C Power Meter GPIB Address
- RS232 GPIB Interface Adapter
- Test Equipment Inter-Unit Connection, Testing, and Control
- Inter-Unit Connection, Testing, and Control Settings
- HP 8921A with PCS Interface Test Equipment Connections
- HP 8921A with PCS Interface System Connectivity Test
- Pretest Set-up for HP 8921A
- Pretest Set-up for Agilent 8935
- Advantest R3465 Connection
- R3465 GPIB Clock Set-up
- Pretest Set-up for Advantest R3465
- Agilent 8932/E4432B Test Equipment Interconnection
- Agilent E4406A/E4432B Test Equipment Interconnection
- Advantest R3267/R3562 Test Equipment Interconnection
- Equipment Calibration
- Manual Cable Calibration
- Appendix G: Downloading ROM Code
- Appendix H: In-Service Calibration
- Appendix I: Packet Backhaul Configuration
- BTS Router Initial Configuration
- Terminal Setup
- Downloading Minimum Canned BTS Router Configuration Files
- Verifying IOS Canned Version of the CF Memory Card
- Replacing Installed BTS Router CF Memory Card IOS Version
- Background
- Equipment and Software Required for Verification Methods
- Required Publications
- Method 1: Replacement of Installed Router CF Card IOS Data
- Method 2: Using a CF Memory Card Reader for Replacement of Installed IOS Version and Changing File Sequence ...
- Change CF Memory Card File Sequence to Place IOS File First on the Card
- Verify and Upgrade ROMMON Version
- Recovery from BTS Router Boot to ROMMON
- Entering or Changing Router FE Interface IP Address
- Preparation for Site Turn-over
- Index
Index – continued
Index-4 1X SC 4812T Lite BTS Optimization/ATP FEB 2005
PRELIMINARY
CLI, 3-25
Clock Sync Module. See CSM
CLPA, 2-12
Code domain power/noise floor
acceptance test, 4-21
analyzer display, 4-22
Command Line Interface, 3-25
command terminal, settings, I-2
Common power supply verification, 2-11 , 2-13
Communication test set, rear panel, F-20 , F-21
Communications test set. See Test equipment
communications test set, TX acceptance tests, 4-4
Connecting test equipment to the BTS, 3-55 , 3-75
Connector Functionality
Backplane, Troubleshooting, 6-22
Troubleshooting, Backplane, 6-22
Control, TX output verification, 4-5
Copy and Load Cal File to to CBSC, 4-26
Copy CBSC CDF Files to the LMF, 3-11
Copying CAL files from CDMA LMF to the CBSC,
4-26
Copying CAL files to the CBSC, 4-26
CSM
clock source, select, 3-41
enable, 3-42
LEDs, 3-45
system description, 3-44
CSM clock source, select, 3-41
CSM frequency verification, 3-47
CSM LED Status Combinations, 6-31
D
DC Power Pre–test, BTS Frame, 2-6
DC Power Problems, SCCP Backplane
Troubleshooting, 6-26
DC/DC Converter LED Status Combinations, 6-30
Detailed, optimization/ATP test matrix, C-1
Devices, download. See Download
Digital Control Problems, 6-24
SCCP Backplane Troubleshooting, 6-24
Digital multimeter, required test equipment, 1-9
Directional coupler, required test equipment, 1-9
diversity receive path, definition, 3-109
expansion frame, 3-110
stand–alone frame, 3-109
diversity RX path. See diversity receive path
Documents, required, 1-12
Download
See also Devices
BTS, 3-36
BTS system software, 3-4
Download BLO Procedure, 3-121
download ROM and RAM code. See ROM code
Download/Enable MCCs, 3-43
Download/Enable MGLIs, 3-39
Duplexer, optional test equipment, 1-10
E
E1, isolate BTS from the E1 spans, 3-16
E4406A, calibration, F-30
Enable CSMs. See CSM
Equipment Overview, 1-16
Equipment warm-up, 3-59 , 3-79
establish MMI communication, 3-31
Ethernet LAN
interconnect diagram, 3-33
transceiver, 1-7
Ethernet LAN termination, 2-5
Every test fails, Troubleshooting, RFDS, 6-28
External Test Equipment Removal, 5-3
F
Failure report generation, 4-25
FER, acceptance test, 4-23
Files, intermediate file, 4-25
files, calibration data, 3-111
Filtronics, low IM Duplexer (Cm035–f2) or
equivalent, optional test equipment, 1-10
Fluke, model 8062A with Y8134 test lead kit, test
equipment, 1-9
Folder Structure Overview, 3-8