User's Manual
Table Of Contents
- Chapter 4: Acceptance Test Procedures
- Automated Acceptance Test Procedure
- Acceptance Tests - Test Set-up
- Abbreviated (All-inclusive) Acceptance Tests
- Individual Acceptance Tests
- TX Spectral Purity Transmit Mask Acceptance Test
- TX Waveform Quality (Rho) Acceptance Test
- TX Pilot Time Offset Acceptance Test
- TX Code Domain Power/Noise Floor Acceptance Test
- RX FER Acceptance Test
- Generating an ATP Report
- Updating Calibration Data Files
- Chapter 5: Prepare to Leave the Site
- Chapter 6: Troubleshooting
- Basic Troubleshooting: Overview
- Troubleshooting: Installation
- Cannot Log into Cell-Site
- Force LAN A Active (LMF Connection at I/O Panel LAN Connector)
- Force LAN A Active (LMF Connection at Service Shelf LAN Connector)
- Set the GLI IP Address
- Cannot Communicate with Power Meter
- Cannot Communicate with Communications System Analyzer
- Cannot Communicate with Signal Generator
- Troubleshooting: Download
- Troubleshooting: Calibration
- Basic Troubleshooting: RF Path Fault Isolation
- Troubleshooting: Transmit ATP
- Troubleshooting: Receive ATP
- Troubleshooting: CSM Checklist
- Troubleshooting: SCCP Backplane
- Troubleshooting: RFDS
- Module Front Panel LED Indicators and Connectors
- Troubleshooting: Span Control Link
- Appendix A: Data Sheets
- Appendix B: PN Offset/I & Q Offset Register Programming Information
- Appendix C: FRU Optimization / ATP Test Matrix
- Appendix D: BBX Gain Set Point vs. BTS Output
- Appendix E: CDMA Operating Frequency Programming Information
- Appendix F: Test Equipment Preparation
- Test Equipment Preparation
- Verifying and Setting GPIB Addresses
- Agilent E4406A Transmitter Tester GPIB Address
- Agilent E4432B Signal Generator GPIB Address
- Advantest R3267 Spectrum Analyzer GPIB Address
- Advantest R3562 Signal Generator GPIB Address
- Agilent 8935 Series E6380 (formerly HP 8935) Test Set GPIB Address
- Hewlett Packard HP 8921A and HP83236A/B GPIB Address
- Advantest R3465 Communications Test Set GPIB Address
- Motorola CyberTest GPIB Address
- HP 437 Power Meter GPIB Address
- Gigatronics 8541C Power Meter GPIB Address
- RS232 GPIB Interface Adapter
- Test Equipment Inter-Unit Connection, Testing, and Control
- Inter-Unit Connection, Testing, and Control Settings
- HP 8921A with PCS Interface Test Equipment Connections
- HP 8921A with PCS Interface System Connectivity Test
- Pretest Set-up for HP 8921A
- Pretest Set-up for Agilent 8935
- Advantest R3465 Connection
- R3465 GPIB Clock Set-up
- Pretest Set-up for Advantest R3465
- Agilent 8932/E4432B Test Equipment Interconnection
- Agilent E4406A/E4432B Test Equipment Interconnection
- Advantest R3267/R3562 Test Equipment Interconnection
- Equipment Calibration
- Manual Cable Calibration
- Appendix G: Downloading ROM Code
- Appendix H: In-Service Calibration
- Appendix I: Packet Backhaul Configuration
- BTS Router Initial Configuration
- Terminal Setup
- Downloading Minimum Canned BTS Router Configuration Files
- Verifying IOS Canned Version of the CF Memory Card
- Replacing Installed BTS Router CF Memory Card IOS Version
- Background
- Equipment and Software Required for Verification Methods
- Required Publications
- Method 1: Replacement of Installed Router CF Card IOS Data
- Method 2: Using a CF Memory Card Reader for Replacement of Installed IOS Version and Changing File Sequence ...
- Change CF Memory Card File Sequence to Place IOS File First on the Card
- Verify and Upgrade ROMMON Version
- Recovery from BTS Router Boot to ROMMON
- Entering or Changing Router FE Interface IP Address
- Preparation for Site Turn-over
- Index
Index – continued
FEB 2005 1X SC 4812T Lite BTS Optimization/ATP Index-3
PRELIMINARY
BBX
Adding, 3-48–3-50
Prerequisites, 3-48–3-50
Logical data, 4-79–4-81
BBX
carrier spectral purity, 4-13
gain set point vs SIF output considerations, D-1
primary and redundant, TX tests to be performed,
4-11
BBX LED status combinations, 6-36
BBX2 Connector, 6-22
BLO. See Bay Level Offset calibration
Broad Band Receiver. See BBX
BTS
download, 3-36
Ethernet LAN interconnect diagram, 3-33
LMF connection, 3-17 , 3-18
RX sensitivity/frame error rate, 4-12
system software download, 3-4
BTS frame, initial power–up, 2-12
BTS Frame Erasure Rate. See FER
BTS Log In Procedure, GUI, 3-26
BTS login
CLI environment, 3-29
General, 3-25
GUI environment, 3-26
BTS Logout
CLI environment, 3-31
GUI environment, 3-30
BTS router communication session, establishing, I-5
BTS router connections
FE verification, I-6
programming, I-6
Create CAL File, 3-125
C
cable calibration, automatic, test set–up, 3-60 , 3-61 ,
3-80 , 3-81
Advantest R3267/R3562, 3-61 , 3-81
Advantest R3465, 3-60 , 3-80
Agilent 8935, 3-60 , 3-80
Agilent E4406A/E4432B, 3-61 , 3-62 , 3-81 , 3-82
CyberTest, 3-60 , 3-80
HP 8921A, 3-60 , 3-80
CAL file. See calibration data file
Calibrate Test Cabling Using Signal Generator &
Spectrum Analyzer, 3-104
Calibrating, Test Equipment, 3-100
Calibrating Cables, Overview, 3-101
Calibrating Test Cable Setup, PCS Interface
HP83236B, F-35
Calibrating Test Cabling using Communications
System Analyzer, 3-102
Calibration, In–Service, H-23
calibration
calibration data file, 3-111
Gigatronics 8542B, F-33
Calibration Audit failure, 6-12
calibration data file, description of, 3-111
Cannot communicate to Communications Analyzer,
6-6
Cannot communicate to Power Meter, 6-5
Cannot Download DATA to any device card, 6-9
Cannot ENABLE device, 6-9
Cannot Log into cell–site, 6-2
Cannot perform Code Domain Noise Power
measurement, 6-18
Cannot perform Rho or pilot time offset
measurement, 6-17
Cannot perform Txmask measurement, 6-17
CDF, 3-4
site equipage verification, 3-5
site type and equipage data information, 2-1
CDI Alarm
with Alarms Test Box, 3-140
without Alarms Test Box, 3-144
CDMA
allocation diagram for the North American, cellular
telephone frequency spectrum, E-4
optimization/ATP test matrix, C-1
subscriber mobile radiotelephone, optional test
equipment, 1-11
Cell Site
equipage verification, 2-1
types configuration, 3-3
Cell Site Data File. See CDF
CIO Connectors, 6-23