User's Manual

Table Of Contents
Preparation for Site Turn–over – continued
FEB 2005 1X SC 4812T Lite BTS Optimization/ATP I-97
PRELIMINARY
What to Do Next
The installation of the Packet Backhaul Option is complete. When the
site is secured, there are no further actions to perform at the BTS Site.
I