User's Manual

Table Of Contents
In–Service Calibration – continued
H-28 1X SC 4812T Lite BTS Optimization/ATP FEB 2005
PRELIMINARY
Table H-6: In–Service Calibration Procedure
n ActionStep
12 Disconnect all Test Cables from the BTS.
13 reconnect RFDS Cables or Termination Loads, as applicable, to the DRDC or TRDC BTS CPL
Ports used for the Calibration.
14 Advise the CBSC to enable the target device(s).
15 Restore the new “bts–*.cal” file to the CBSC.
Refer to Table 4-12.
H