TX Waveform Quality (Rho) Acceptance Test – continued
FEB 2005 1X SC 4812T Lite BTS Optimization/ATP 4-17
PRELIMINARY
Table 4-6: Waveform Quality (Rho) Test Procedure
n ActionStep
5 Verify that the correct Channel Number for the selected carrier is shown in the Carrier #
Channels Box.
If it is not, obtain the latest bts–#.cdf (or bts–#.necf) and cbsc–#.CDF Files from the CBSC.
NOTE
If necessary, the correct Channel Number may be manually entered into the Carrier # Channels
Box.
6 Click OK to display a Status Bar followed by a Directions Pop–up Window.
7 Follow the Cable Connection Directions as they are displayed, and click the Continue Button to
begin testing.
As the ATP Process is completed, results will be displayed in a Status Report Window.
8 Click either the Save Results Button or the Dismiss Button.
* IMPORTANT
If Dismiss is used, the test results will not be saved in the Test Report File.