User's Manual

Table Of Contents
Test Equipment Inter–Unit Connection, Testing, and Control – continued
F-22 1X SC 4812T Lite BTS Optimization/ATP FEB 2005
PRELIMINARY
HP 8921A with PCS Interface
System Connectivity Test
Perform the procedure in Table F-15 to verify that the connections
between the PCS Interface and the HP 8921A are correct and cables are
intact. The software also performs basic functionality checks of each
instrument.
Disconnect other GPIB Devices, especially system
controllers, from the system before running the
connectivity software.
NOTE
Table F-15: System Connectivity Test Procedure
n Step Action
NOTE
Perform this procedure only after Test Equipment has been allowed to warm–up and stabilize for a
minimum of 60 minutes.
1 Insert the HP 83236A Manual Control/System Card into the Memory Card Slot.
2 Press the [PRESET] Pushbutton.
3 Press the Screen Control [TESTS] Pushbutton to display the “Tests” Main Menu Screen.
4 Position the cursor on Select Procedure Location and select it by pressing the Cursor Control
Knob.
5 In the Choices Selection Box, select Card.
6 Position the cursor on Select Procedure Filename and select it by pressing the Cursor Control
Knob.
7 In the Choices Selection Box, select SYS_CONN.
8 Position the cursor on RUN TEST and select it.
The software will provide operator prompts through completion of the Connectivity Set–up.
9 Perform the following action when the test is complete.
Position cursor on STOP TEST and select it.
OR
Press the [K5] Pushbutton.
10 To return to the Main Menu, press the [K5] Pushbutton.
11 Press the [PRESET] Pushbutton.
F