User's Manual

Table Of Contents
Test Equipment Preparation – continued
F-4 1X SC 4812T Lite BTS Optimization/ATP FEB 2005
PRELIMINARY
Use only
Agilent supplied
power adapter
GPS
GPIO
Serial 1
Serial 2
Power REF
50 MHz
Sensor
Ext Ref
In
Even Second
Sync In
Antenna
Port 1
RF Out / SWR
Port 2
RF In
POWER SENSOR
CONNECTED
Figure F-2: Agilent E7495A Power Sensor Calibration Connection
Cable Calibration
Follow the directions in the WinLMF Program to calibrate cables.
Calibrate the Short Test Cable (refer to Figure 3-15 on Page 3-66)
and two 10 dB Pads to get a Base Line and then calibrate the TX
and RX set–up. Since you need at least 40 dB of Loss when doing
the FER Test, the set–up for RX is the same as TX.
ATP Set–up
TX Path Calibration Set–up is shown in Test Equipment Set–up. Refer
to Figure 3-18 on Page 3-69.
F