User's Manual

Table Of Contents
FRU Optimization/ATP Test Matrix – continued
FEB 2005 1X SC 4812T Lite BTS Optimization/ATP C-3
PRELIMINARY
Table C-1: SC 4812ET Lite BTS Optimization and ATP Test Matrix
Doc
Table
#
RFDS
RFDS Cables
Switch Card
LPA Bandpass Filter or Combiner
LPA or LPA Trunking Module
LPAC Cable
ETIB or Associated Cables
GLI2
CCD Card
RGD/20–pair Punchblock with RGD
50–pair Punchblock (with RGPS)
HSO/HSOX
CSM/GPS
MCC24E/MCC8E/MCC–1X
BBX2/BBX–1X
SCCP Shelf Assembly (Backplane)
CIO
MPC / EMPC
TX Cables
RX Cables
DRF or TRF
Description
OPTIMIZATION AND TEST LEGEND:
D Required
* Perform if determined necessary for additional fault isolation, repair assurance, or required for site certification.
1. Perform on all carrier & sector TX Paths to the SCCP Cage.
2. Perform on all carrier & sector main and Diversity RX Paths to the SCCP Cage.
3. Perform on all primary & redundant TX Paths of affected carrier. (LPAC replacement affects all carriers.)
4. Perform on affected carrier & sector TX Path(s) (BBXR replacement affects all carrier & sector TX Paths).
5. Perform on the affected carrier and sector RX Path(s) (BBXR replacement affects all carrier RX Paths).
6. Perform on all RF Paths of the affected carrier & sector (RFDS replacement affects all carriers).
7. Perform with Redundant BBX for at least one sector on one carrier.
8. Verify performance by performing on one sector of one carrier only.
9. Perform only if RGD/RGPS or HSO expansion was installed.
10. Verify performance by performing testing on one sector of each carrier.
C