User's Manual
Table Of Contents
- Chapter 1: Introduction
- Chapter 2: Preparatory Tasks
- Chapter 3: Optimization/Calibration
- Introduction to Optimization and Calibration
- Preparing the LMF
- Overview of Packet BTS Files
- LMF Features and Installation Requirements
- LMF File Structure Overview
- LMF Home Directory
- NECF Filename Conventions and Directory Location
- LMF Installation and Update Procedures
- Copy BTS and CBSC CDF (or NECF) Files to the LMF Computer
- Creating a Named HyperTerminal Connection for MMI Communication
- Span Lines - Interface and Isolation
- LMF to BTS Connection
- Switching the Active LAN - LMF I/O Panel 10Base-2 LAN Connection
Span Lines – Interface and Isolation – continued
FEB 2005 1X SC 4812T Lite BTS Optimization/ATP 3-17
PRELIMINARY
T1/E1 Span Isolation
Table 3-5 describes the action required for Span Isolation.
Table 3-5: T1/E1 Span Isolation Procedure
n Step Action
1 Have the OMC–R/CBSC place the BTS OOS.
2 To disable the Span Lines, locate the Connector for the Span or Spans that must be disabled and
remove the respective connector from the applicable SCCP Cage Span I/O Board (Figure 3-2).
3