User's Manual
Table Of Contents
- Chapter 1: Introduction
- Chapter 2: Preparatory Tasks
- Chapter 3: Optimization/Calibration
- Introduction to Optimization and Calibration
- Preparing the LMF
- Overview of Packet BTS Files
- LMF Features and Installation Requirements
- LMF File Structure Overview
- LMF Home Directory
- NECF Filename Conventions and Directory Location
- LMF Installation and Update Procedures
- Copy BTS and CBSC CDF (or NECF) Files to the LMF Computer
- Creating a Named HyperTerminal Connection for MMI Communication
- Span Lines - Interface and Isolation
- LMF to BTS Connection
- Switching the Active LAN - LMF I/O Panel 10Base-2 LAN Connection
Introduction to Optimization and Calibration – continued
3-2 1X SC 4812T Lite BTS Optimization/ATP FEB 2005
PRELIMINARY
Table 3-1: Basic Optimization Procedure
n ActionStep
5 Code Load the first MGLI.
omc–000000 >LOAD MGLI–<bts#>–1
* IMPORTANT
The parent CSM(s) must be in service.
NOTE
The GLI can be either a GLI2 or a GLI3.
6 Code Load each BBX, and then the BBXR.
omc–000000 >LOAD BBX–<bts#>–<bbx#>
omc–000000 >LOAD BBX–<bts#>–<bbxr#>
7 Verify that the PWR/ALM LED on each BBX and the BBXR goes GREEN.
S If all the LEDs do go GREEN, proceed to Step 8.
S If any LED does not go GREEN, replace the faulty BBX.
– Refer to the 1X SC4812T Lite BTS FRU manual (68P09262A60) Manual for replacement
instructions.
8 Code Load each remaining GLI.
omc–000000 >LOAD MGLI–<bts#>–<mgli#>
* IMPORTANT
The parent CSM(s) must be in service.
NOTE
The GLI Cards can be either GLI2s or GLI3s.
9 Code Load each MCC.
omc–000000 >LOAD MCC–<bts#>–<mcc#>
10 Code Load the RFDS TSIC or RFDS–1X RPROC (if installed).
omc–000000 >LOAD TSIC–<bts#>–<tsic#>
or
omc–000000 >LOAD RPROC–<bts#>–<rproc#>
table continued on next page
3