User's Manual

Table Of Contents
Introduction to Optimization and Calibration
FEB 2005 1X SC 4812T Lite BTS Optimization/ATP 3-1
PRELIMINARY
Overview
This section describes procedures for the following tasks.
Isolating the BTS from the Span Lines.
Preparing and using the LMF.
Downloading System Operating Software.
CSM Reference Verification/Optimization.
Set–up and Calibration of the supported Test Equipment.
Transmit/Receive Path Verification.
Using the RFDS.
Verifying that the Customer–defined Alarms and Relay Contacts are
functioning properly.
Before using the LMF, use a Text Editor to view the
“CAVEATS” section in the “readme.txt” File in the
c:\wlmf Folder for any applicable information.
NOTE
Optimization Process
Summary
After a BTS is physically installed and the Preliminary Operations, such
as Power–up, have been completed, the LMF is employed to optimize
the BTS. Companion Frames must be optimized individually as separate
BTSs. The basic Optimization Process consists of the following:
Table 3-1: Basic Optimization Procedure
n Step Action
1 Enable CSM 2.
omc–000000 >ENABLE CSM–<bts#>–2
2 Verify that CSM 2 is INS_ACTIVE.
omc–000000 >STATUS CSM–<bts#>–1 PHY
S If CSM 2 is INS_ACTIVE, proceed to Step 5.
S If CSM 2 is not INS_ACTIVE, call the Customer Network Resolution Center.
3 Enable CSM 1.
omc–000000 >ENABLE CSM–<bts#>–1
4 Verify that CSM 1 is INS_ACTIVE and CSM 2 is INS_STANDBY.
omc–000000 >DISPLAY BTS–<bts#> STATUS
S If CSM 1 is INS_ACTIVE and CSM 2 is INS_STANDBY, proceed to Step 6.
S If CSM 1 is not INS_ACTIVE and/or CSM 2 is not INS_STANDBY, call the Customer
Network Resolution Center.
table continued on next page