User's Manual

Table Of Contents
Initial Power–up Tests and Procedures – continued
2-14 1X SC 4812T Lite BTS Optimization/ATP FEB 2005
PRELIMINARY
Table 2-5: Common Power Supply Module Verification Procedure
n ActionStep
7 Plug in the Power Supply Modules one at a time.
8 Verify that the PSM LED on each Power Supply Module appears GREEN.
2