User's Manual
Table Of Contents
- Chapter 1: Introduction
- Chapter 2: Preparatory Tasks
- Chapter 3: Optimization/Calibration
- Introduction to Optimization and Calibration
- Preparing the LMF
- Overview of Packet BTS Files
- LMF Features and Installation Requirements
- LMF File Structure Overview
- LMF Home Directory
- NECF Filename Conventions and Directory Location
- LMF Installation and Update Procedures
- Copy BTS and CBSC CDF (or NECF) Files to the LMF Computer
- Creating a Named HyperTerminal Connection for MMI Communication
- Span Lines - Interface and Isolation
- LMF to BTS Connection
- Switching the Active LAN - LMF I/O Panel 10Base-2 LAN Connection
Optimization Manual Scope and Layout – continued
1-2 1X SC 4812T Lite BTS Optimization/ATP FEB 2005
PRELIMINARY
S Basic Troubleshooting: consists of procedures to perform when an
ATP fails, as well as when incorrect results are obtained during
Logon, Test Equipment Operation, Calibration, and Global
Positioning System (GPS) Operation.
S Appendices:
– Data Sheets for CFEs recording at the site
– Pseudo–random Noise (PN) Offset Information
– Optimization/ATP Matrix
– BBX Gain Set Point vs BTS Output
– CDMA Operating Frequency Programming Information
– Manual Test Set–up Information
– Downloading ROM and RAM Code
– In–service Acceptance Test Procedures
1