User's Manual
Table Of Contents
- Chapter 1: Introduction
- Chapter 2: Preparatory Tasks
- Chapter 3: Optimization/Calibration
- Introduction to Optimization and Calibration
- Preparing the LMF
- Overview of Packet BTS Files
- LMF Features and Installation Requirements
- LMF File Structure Overview
- LMF Home Directory
- NECF Filename Conventions and Directory Location
- LMF Installation and Update Procedures
- Copy BTS and CBSC CDF (or NECF) Files to the LMF Computer
- Creating a Named HyperTerminal Connection for MMI Communication
- Span Lines - Interface and Isolation
- LMF to BTS Connection
- Switching the Active LAN - LMF I/O Panel 10Base-2 LAN Connection
List of Tables – continued
FEB 2005 1X SC 4812T Lite BTS Optimization/ATP xiii
PRELIMINARY
Table 6-43: MCC Card PWR/ALM LED States 6-38 . . . . . . . . . . . . . . . . . . . . . . . .
Table 6-44: MCC Card ACTIVE LED States 6-38 . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 6-45: MCC Card PWR/ALM and ACTIVE LED States 6-39 . . . . . . . . . . . . .
Table 6-46: LPA ETIB Module LED 6-41 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 6-47: Control Link Failure Troubleshooting Procedure 6-42 . . . . . . . . . . . . . .
Table 6-48: Set BTS Span Parameter Configuration Procedure 6-44 . . . . . . . . . . . . .
Table A-1: Verification of Test Equipment Used A-1 . . . . . . . . . . . . . . . . . . . . . . . .
Table A-2: Site Checklist A-2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table A-3: Preliminary Operations A-2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table A-4: Pre–power Checklist A-3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table A-5: General Optimization Checklist A-4 . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table A-6: GPS Receiver Operation A-5 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table A-7: LPA IM Reduction A-6 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table A-8: TX BLO Calibration
(Three Sector: One Carrier and Two Carrier Non–adjacent Channels) A-7 . . . . . .
Table A-9: TX Bay Level Offset Calibration
(Three Sector: Two Carrier Adjacent Channels) A-8 . . . . . . . . . . . . . . . . . . . . . . .
Table A-10: TX Antenna VSWR A-9 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table A-11: RX Antenna VSWR A-9 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table A-12: CDI Alarm Input Verification A-10 . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table B-1: PnMaskI and PnMaskQ Values for PilotPn B-3 . . . . . . . . . . . . . . . . . . .
Table C-1: SC 4812ET Lite BTS Optimization and ATP Test Matrix C-2 . . . . . . . .
Table D-1: BBX Gain Set Point vs. Actual BTS Output (in dBm) D-1 . . . . . . . . . .
Table E-1: 1900 MHz TX and RX Frequency vs. Channel E-2 . . . . . . . . . . . . . . . .
Table E-2: 800 MHz TX and RX Frequency vs. Channel E-5 . . . . . . . . . . . . . . . . .
Table F-1: Set IP Address on Agilent E7495A Test Set F-1 . . . . . . . . . . . . . . . . . . .
Table F-2: Agilent E7495A Test Equipment Detection Procedure F-2 . . . . . . . . . . .
Table F-3: E7495A Power Sensor Calibration Procedure F-3 . . . . . . . . . . . . . . . . .
Table F-4: Verify and Change Agilent E4406A GPIB Address Procedure F-5 . . . .
Table F-5: Verify that and Change Agilent E4432B GPIB Address F-7 . . . . . . . . .
Table F-6: Verify that and Change Advantest R3267 GPIB Address F-8 . . . . . . . . .
Table F-7: Verify and/or Change Agilent 8935 (formerly HP 8935) GPIB
Address Procedure F-10 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table F-8: Verify and/or Change HP 8921A and HP 83236A GPIB
Addresses Procedure F-12 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table F-9: Verify and/or Change Advantest R3465 GPIB Address Procedure F-14 .
Table F-10: Verify and/or Change Motorola CyberTest GPIB
Address Procedure F-15 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table F-11: Verify and/or Change the HP 437 Power Meter GPIB
Address Procedure F-16 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .