User's Manual

Preliminary Operations: Overview
08/01/2001
2-1
1X SCt4812ET Lite BTS Optimization/ATP
PRELIMINARY
Introduction
This section first verifies proper frame equipage. This includes verifying
module placement, jumper, and dual inline package (DIP) switch
settings against the site-specific documentation supplied for each BTS
application. Next, pre-power up and initial power-up procedures are
presented.
Cellsite Types
Sites are configured as 3sector with one or two carriers. Each type has
unique characteristics and must be optimized accordingly.
CDF
The Cell-site Data File (CDF) contains site type and equipage data
information and passes it directly to the CDMA Local Maintenance
Facility (LMF) during optimization. The number of BTS frames, BBX2
and MCC24 boards, and linear power amplifier assignments are some of
the equipage data included in the CDF.
Site Equipage Verification
Review the site documentation. Match the site engineering equipage data
to the actual boards and modules shipped to the site. Physically inspect
and verify the equipment provided for the frame.
Always wear a conductive, high impedance wrist strap
while handling any circuit card/module to prevent damage
by ESD. After removal, the card/module should be placed
on a conductive surface or back into the antistatic bag it
was shipped in.
CAUTION
Initial Installation of
Boards/Modules
Table 2-1: Initial Installation of Boards/Modules
Step Action
1 Refer to the site documentation and, if it was not previously done, slide all boards and modules into
the appropriate shelves as required. DO NOT SEAT the boards and modules at this time.
2 As the actual site hardware is installed, record the serial number of each module on a Serial Number
Checklist in the site logbook.
2