User's Manual

Index continued
08/01/2001
1X SCt4812ET Lite BTS Optimization/ATP
PRELIMINARY
Index-7
Timing reference cables, required test equipment
Model SGLN1145A/4132A CSMs, 1-9
Model SGLN4132B CSMs, 1-9
Transmit TX path audit, 3-74
Transmit TX path calibration, 3-70
Troubleshooting
DC Power Problems, 6-24
RF path fault isolation, 6-12
Set span configuration, 6-36
span problems, 6-35
TX and RX Signal Routing, 6-25
TX level accuracy fault isolation, 6-14
Troubleshooting CSM Checklist, 6-18
TX
acceptance tests
code domain power/noise floor, 4-15
equipment setup, 4-3
pilot time offset, 4-13
spectral purity mask, 4-9
spectrum analyzer display, 4-11
waveform quality (rho), 4-12
all inclusive TX ATP test, 4-4
antenna VSWR, test data sheets, A-10, A-11
BLO test data sheets, A-8
level accuracy fault isolation, 6-14
output acceptance tests
code domain power noise, 4-7
pilot time offset, 4-7
waveform quality, 4-7
TX & RX Path Calibration, 3-65
TX and RX Frequency vs Channel , D-2
TX and RX Signal Routing, CCCP Backplane
Troubleshooting, 6-25
TX Audit Test, 3-75
TX Bay Level Offset and TX ATP test equipment
setup calibration, 3-61
TX Calibration Test, 3-72
tx fine adjust, E-1
TX Path Calibration, 3-66
TX/RX OUT Connections, 4-2
U
UNIX, shut down on LMF, 5-4
Unshielded Twisted Pair. See UTP
Updating CDMA LMF Files, 5-1
UTP, LMF to BTS connection, 3-21
V
Verify
test equipment used, test data sheets, A-1
TX output, 4-3
Verify GLI ROM code load, 3-33
version Folder, 3-11
Virtual BTS, 1-15
W
Waveform quality (Rho), acceptance test procedure,
4-12
When to optimize
BTS, B-1
interframe cabling, B-1
X
XCVR Backplane Troubleshooting, 6-20
Xircom Model PE310B2
LMF to BTS connection, 3-21
remove from BTS, 5-4