User's Manual

Index continued
PRELIMINARY
1X SCt4812ET Lite BTS Optimization/ATP
08/01/2001Index-4
HSO Initialization/Verification, 3-38
Huber & Suhner, required test equipment, 1-9
HyperTerminal, Creating named HyperTerminal
connection, 3-7
HyperTerminal , create named connection, 3-7
I
I and Q values, E-1
Initial HP8921A setup, F-14
Initial Installation of Boards/Modules, preliminary
operations, 2-1
Initial power tests, test data sheets, A-3
Interframe cabling, when to optimize, B-1
Intermediate file, generate ATP file using, 4-20
IS97 specification, E-1
L
LAN
BTS frame interconnect, illustration, 3-29
optional test equipment, 1-10
LAN connectors, external, 2-3
LAN termination, 2-3
LED Status Combinations for all Modules except
GLI2 CSM BBX2 MCC24 MCC8E, 6-28
LFR, receiver operation, test data sheets, A-6
LMF, F-1, F-7
BTS connection, 3-21
logout procedure, 5-4
platform requirements, 1-6
remove from BTS, 5-4
shut down UNIX, 5-4
terminal, 1-6
to BTS connection, 3-14, 3-15
TX acceptance tests, 4-3
view CDF information, 3-3
lmf Folder, 3-9
loads folder, 3-11
Local Maintenance Facility. See LMF
Log out
of BTS, 5-4
of LMF PC, 5-4
Logging Into a BTS, 3-23
Logging Out, 3-25
LORANC Initialization/Verification, 3-46
LPA errors, 6-9
LPA Module LED, 6-34
LPA Shelf LED Status Combinations, 6-34
M
Master Group Line Interface. See MGLI
MASTER LED, GLI, 6-31
MCC LED Status Combinations, 6-33
MMI common connections, 3-28
MMI Connector
CSM, 6-30
GLI, 6-32
MMI Connectors, MCC, 6-33
MMI equipment setup, 3-28
Module status indicators, 6-28
Multi Channel Card. See MCC
MultiFER test Failure, 6-17
N
New installations, 1-4
No AMR control, 6-22
No BBX2 control in the shelf, 6-23
No DC input voltage to Power Supply Module, 6-24
No DC voltage +5 +65 or +15 Volts to a specific
GLI2 BBX2 or Switch board, 6-25
No GLI2 Control through span line connection, 6-22
No GLI2 Control via LMF, 6-21
No or missing MCC24 channel elements, 6-23
No or missing span line traffic, 6-23
North American, cellular telephone system frequency
spectrum, CDMA allocation, D-4
O
Online Help, 3-28
Optional test equipment, 1-10
10 MHz rubidium standard, 1-11
2way splitter, 1-10