User's Manual
Index – continued
08/01/2001
1X SCt4812ET Lite BTS Optimization/ATP
PRELIMINARY
Index-3
DC Power Problems, C–CCP Backplane
Troubleshooting, 6-24
DC/DC Converter LED Status Combinations, 6-28
Detailed, optimization/ATP test matrix, B-2
Devices, download. See Download
Digital Control Problems, 6-21
C–CCP Backplane Troubleshooting, 6-21
Digital multimeter, required test equipment, 1-9
Directional coupler, required test equipment, 1-9
Documents, required, 1-12
Download
See also Devices
BTS, 3-32
BTS system software, 3-3
Download BLO Procedure, 3-73
Download from the CBSC, prepare to leave the site,
5-3
download ROM and RAM code, G-2
Download/Enable MCCs, 3-37
Download/Enable MGLIs, 3-34
Duplexer, optional test equipment, 1-10
E
E1, isolate BTS from the E1 spans, 3-14
Enable CSMs & BDCs, 3-36
End LMF session, 5-4
Equipment Overview, 1-15
Equipment warm-up, 3-50
establish MMI communication, 3-27
Ethernet LAN
interconnect diagram, 3-29
transceiver, 1-7
Ethernet LAN termination, 2-3
Every test fails, Troubleshooting, RFDS, 6-26
F
Failure report generation, 4-20
FER, acceptance test, 4-19
Files
calibration data file, BLO, 3-67
intermediate file, 4-20
Filtronics, low IM Duplexer (Cm035–f2) or
equivalent, optional test equipment, 1-10
Fluke, model 8062A with Y8134 test lead kit, test
equipment, 1-9
Folder Structure Overview, 3-9
Frame, equipage preliminary operations, 2-1
FREQ Monitor Connector, CSM, 6-30
Frequency counter, optional test equipment, 1-10
G
Gain set point, C-1
Generating an ATP Report, 4-20
General optimization checklist, test data sheets, A-4
Gigatronics 8542B power meter, illustration, F-13
GLI Connector, 6-20
GLI Ethernet A and B Connections, 6-20
GLI LED Status Combinations, 6-31
GLI Pushbuttons and Connectors, 6-32
GLI2 Front Panel Operating Indicators, 6-32
GPIB, F-1, F-5, F-7
cables, 1-8
GPS, receiver operation, test data sheets, A-5
GPS Initialization/Verification
estimated position accuracy, 3-41
surveyed position accuracy, 3-41
GPS satellite system, 3-37
Group Line Interface. See GLI
H
Hardware Requirements, 1-6
High Stability 10 MHz Rubidium Standard, optional
test equipment, 1-11
High–impedance conductive wrist strap, required test
equipment, 1-9
HP 83236A, F-5
HP 8921A/600 test set, 1-8
HP8921A, F-5