Acceptance Tests – Test Set Up
08/01/2001
4-3
68P09253A60
1X SCt4812ET Lite BTS Optimization/ATP
PRELIMINARY
Required Test Equipment
The following test equipment is required:
S LMF
S Power meter (used with HP8921A/600 and Advantest R3465)
S Communications test set
Before installing any test equipment directly to any TX
OUT connector, verify that there are no CDMA channels
keyed.
At active sites, have the OMCR/CBSC place the carrier
assigned to the LPAs under test OOS. Failure to do so can
result in serious personal injury and/or equipment damage.
WARNING
You must recalibrate the test equipment before using it to
perform the TX Acceptance Tests.
NOTE
Acceptance Test Equipment
Set Up
Follow the steps in Table 4-1 to set up test equipment for all tests.
Table 4-1: Set Up Test Equipment – TX Output Verify/Control Tests
Step Action
1 If it has not already been done, interface the LMF computer to the BTS (refer to Table 3-6 and
Figure 3-10).
2 If it has not already been done, refer to Table 3-7 to start a GUI LMF session and log into the BTS.
3 If it has not already been done, refer to Figure 3-17 or Figure 3-18, as applicable for the test
equipment being used, to connect test equipment for acceptance testing.
* IMPORTANT
CDMA LMF–based measurement commands factor in TX test cable loss between the RFM frame and
test equipment. No additional attenuation can be inserted as the additional losses would not be
factored in.