User Manual
Alarm and Span Line Cable Pin/Signal Information
68P09255A57-2
Aug 2002
SC4812ET Optimization/ATP Manual Software Release R16.1.x.x
PRELIMINARY
3-12
T1/E1 Span Isolation
Table 3-2 describes the action required for span isolation.
Isolate BTS from T1/E1 Spans
NOTE
At active sites, the OMC/CBSC must disable the BTS and place
it out of service (OOS). DO NOT remove the span surge
protectors until the OMC/CBSC has disabled the BTS.
Table 3-2: T1/E1 Span Isolation
Step Action
1 The OMC/CBSC must disable the BTS and place it OOS.
The Span Lines can be disabled by removing the surge protectors on the 50-pin punch block. Using
Table 3-1 locate the span or spans which need to be disabled and remove the respective surge
protector.
NOTE
If a third party is used for span connectivity, the third party must be informed before disabling the span
line.
3