User Manual
Index
68P09255A57-2
SC4812ET Optimization/ATP Manual Software Release R16.1.x.x
PRELIMINARY
Aug 2002
Index-4
Every test fails, Troubleshooting, RFDS, 6-33
F
fer test, 4-16
Files, calibration data file, BLO, 3-100
Folder Structure Overview, 3-21, 3-23
Foreword, xx
FREQ Monitor Connector, CSM, 6-40
Frequency counter, optional test equipment, 1-15
G
Gain set point, C-2
General Safety, xxii
General optimization checklist, test data sheets, A-6
Gigatronics 8542B power meter, illustration, F-25,
I-4
Gigatronics Power Meter, 3-64
GLI. See Master (MGLI2) and Slave (SGLI2) Group
Line Interface
GLI Connector, 6-25
GLI Ethernet A and B Connections, 6-25
GLI LED Status Combinations, 6-41
GLI Pushbuttons and Connectors, 6-42
GLI2, 1-21
GLI2 Front Panel Operating Indicators, 6-42
GPIB, F-3, F-7, F-11
Advantest R3465, I-9
HP83236A/B, I-7
HP8921A, I-7
HP8935, I-6
power meter
Gigatronics 8542B, I-4
HP437B, I-3
set address, Motorola CyberTest, I-5
GPIB Cables, 1-13
GPS, receiver operation, test data sheets, A-7
GPS Initialization/Verification
estimated position accuracy, 3-55
surveyed position accuracy, 3-55
GPS satellite system, 3-49
Graphical User Interface Overview , 3-34, 3-35
Group Line Interface. See GLI
H
Hardware Requirements, 1-9
High Stability 10 MHz Rubidium Standard, 1-15
High-impedance Conductive Wrist Strap, 1-14
HP 437B, 3-64
HP 83236A, F-7
HP 8921, 3-64
HP83236A/B, GPIB, I-7
HP8921A, F-7
GPIB, I-7
HP8935, GPIB, I-6
HP8935 Analyzer, 1-13
HSO, 1-21
HSO Initialization/Verification, 3-53
I
I and Q values, E-3
In-Service Calibration, G-18
Initial HP8921A setup, F-16
Initial Installation of Boards/Modules, preliminary
operations, 2-2
Initial power tests, test data sheets, A-5
Installation and Update Procedures, 3-16
Intercabinet I/O, 1-22
Internal FRU, 1-29
Internal FRUs, 1-20
IS-97 specification, E-3
ISB Inter Shelf Bus connectors, 6-24
L
LAN, BTS frame interconnect, illustration, 3-25