User Manual

Adjusting for loss
68P09255A57-2
Aug 2002
SC4812ET Optimization/ATP Manual Software Release R16.1.x.x
PRELIMINARY
3-84
Exception Handling
In the event of a failure, the calibration procedure displays a FAIL
message in the status report window and provides information in the
Description field.
Recheck the test setup and connection and re-run the test. If the tests fail
again, note specifics about the failure, and refer to Chapter 6,
Troubleshooting.
All Cal/Audit Test
The Tests menu item, All Cal/Audit, performs the TX BLO Calibration
and Audit test for a XCVR(s). All measurements are made through the
appropriate TX output connector using the calibrated TX cable setup.
NOTE
If the TX calibration portion of the test passed, the BLO data
will automatically be downloaded to the BBX(s) before the audit
portion of the test is run.
Prerequisites
Before running this test, the following should be done:
CSM-1, GLI3s, BBXs have correct code and data load.
Primary CSM and MGLI3 are INS.
All BBXs are OOS_RAM.
Test equipment and test cables are calibrated and connected for TX
BLO calibration.
LMF is logged into the BTS.
Follow the procedures in Table 3-44 to perform the All Cal/Audit test.
WARNING
Before installing any test equipment directly to any TX OUT
connector, first verify there are no CDMA BBX channels
keyed. Failure to do so can result in serious personal injury
and/or equipment damage.
3