User's Manual Part 1

Site Preparation Overview
Jun 2004
2-1
1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU
DRAFT
Overview
This chapter provides the procedures and information to verify that the
site is ready to have the equipment installed. It also provides procedures
to ensure the safety of the installation personnel, protect the equipment
from damage, and verify the site layout parameters.
Installation
This SCt480 BTS can be installed indoors or outdoors. The site
preparation depends on the type of installation and the site
characteristics. Battery back up is optional and provided by the
customer.
Verifications and procedures
The verifications and procedures provided in this chapter are:
S Internal site inspections
S Preparing site for the arrival of equipment
S Site layout verification
Site manager
The site manager is the person in charge of and responsible for the full
site.
Verifications and inspections
Verifications typically have the installer check with the site manager that
a condition has been previously checked or procedure previously
performed and meets a stated specification.
Inspections typically have the installer personally checking that a
condition or item meets stated specifications.
2