User's Manual Part 1

Installation Tools and Materials – continued
Jun 2004
1-13
1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU
DRAFT
Table 1-3: Recommended Tools and Materials for Rack Mounting
Hand Tools PurposeMaterials
6 AWG stranded
(Customer Supplied)
Ground cabling
Assorted ground lugs
(6AWG, 10 AWG) ring style
(Customer Supplied)
Site ground cabling, Core power
input
Assortment of flat washers,
lock washers
(Customer Supplied)
Mounting equipment to racks and for
general purpose
Assortment of nuts M3 – M6
(Customer Supplied)
Mounting equipment to racks and for
general purpose
Rack screws (depends on
rack style used)
(Customer Supplied)
Rack mounting
T1/E1 span cabling (4 or 8
wire TP style)
(Customer Supplied)
Span and cCLPA signal cabling
ILSCO p/n CRB–6L2–14–58
two–hole ground lugs or
equiv. Hole spacing 5/8”,
hole sizes for 1/4” bolt, tang
width 13/32”.
(Customer Supplied)
Ground Lugs
Chalk or marker to mark
location on rack
(Customer Supplied)
1