User's Manual Part 1

Introduction – continued
Jun 2004
1-3
1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU
DRAFT
Appendix H
“Integrated BTS Router Installation ” – This appendix contains general
information and procedures IBR and span line installation.
Appendix I
“Packet Backhaul BTS ” – This appendix contains general information
and procedures for packet backhaul operation with LMF Help.
Appendix J
“BTS Highway Cell Configuration” – This appendix contains general
information and procedures for highway configuration operation.
Site Cleanliness
While performing the procedures provided in this document, ensure
that:
S for an internal installation, the site is kept clean and free of tracked-in
dirt
S all packing material has been removed from the equipment.
S all tools not currently in use are picked-up as the installation
progresses.
S all trash is removed from the site at the end of each day and after the
installation is complete.
S equipment is covered with a tarpaulin whenever possible.
S use a shop-vac whenever you perform an internal installation
procedure that generates dust, such as drilling or cutting.
Site Manager
The site manager is the person in charge of and responsible for the full
site. The installer will be verifying a variety of conditions with the site
manager.
System Diagrams
Figure 1-1 shows the BTS mounted on a rack. The configuration is for
indoor operation.
Configurations
The BTS supports the omni configuration.
The power configuration for the BTS is:
S DC power only
The synchronization configurations for the BTS are:
S Remote GPS Receiver – synchronous operation
S RF GPS
1