User's Manual Part 1
Introduction
Jun 2004
1-1
1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU
DRAFT
Scope of this Document
This document provides information pertaining to the hardware
installation, cabling installation, ATP and Field Replaceable Unit (FRU)
procedures of the Motorola SCt480 CDMA Base Transceiver
Subsystem (BTS), 1.9 GHz, +27 VDC versions. Information on Circuit
and Packet Backhaul, Expansion, and Logical BTS are also included.
The FRU procedures cover all components that are considered
replaceable.
An individual SCt480 BTS will be referred to as the “BTS” for the
remainder of this document.
For detailed installation information of non-Motorola equipment, refer to
the vendor manuals provided with such equipment.
Manual Order
The installation order is the order of the manual starting at Chapter 1 and
continuing through Chapter 5. After hardware installation has been
completed, run the ATP for the system by following the procedures
defined in Chapter 6 of this manual.
Chapter 1
“Introduction” — This is a brief outline of the manual. Also provided is
a list of additional documents and tools necessary to complete the
procedures.
Chapter 2
“Site Preparation” — This chapter contains the necessary information to
verify the condition of the site.
Chapter 3
“BTS Cables” — This chapter contains the general information on the
cables required for the Compact BTS.
Chapter 4
“Installation of Equipment, Cables, and GPS” — This chapter contains
procedures for installing the equipment, external AC, DC, data, ground
antenna, and GPS cabling.
Chapter 5
“Pre–Power–Up, Initial Power, and Removal of Power” — This chapter
contains procedures for performing electrical power checks.
Chapter 6
“Optimization and Calibration Procedures” – This chapter contains
general information and procedures for optimizing the BTS.
1