User's Manual Part 1

Installation Overview – continued
DRAFT
1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU
Jun 2004
4-2
4. Mount BTS inside TME
5. Attach HMS to TME
6. Detach Heat Exchanger from PDE
7. Mount PDE onto mounting bracket
8. Attach Heat Exchanger to PDE
9. Mount PA onto mounting bracket
10. Attach earth ground cables
11. Attach the DC input power cable
12. Attach DC output power cables
13. Attach antenna cable
14. Attach PA data cables
15. Terminate unused connectors
16. Power on the unit
17. Clean up site
18. Fill out the installation completion checklist
Installation of EV–DO
Information regarding the installation of a BTS equipped with EV–DO
(MCC–DO) can be found in 1xEV–DO Hardware Installation manual –
68P09257A95
4