User's Manual
Span Line, RGPS, and RF–GPS Cabling – continued
DRAFT
1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU
Jun 2004
4-74
ti–cdma–wp–00311–v01–ildoc–ah
DAISY–CHAIN SYNC – OUT
SDCX KIT NO.
SDCX SERIAL NO.
DAISY–CHAIN POWER
SDCX POWER
EXPANSION FRAME SYNC – OUT
RF–GPD IN
PWR
J
D
Customer I/O
Figure 4-48: Span and RF–GPS Cabling Details
Connecting MCC–DO
At the front of the BTS under the CCP2 Shelf, there are two ethernet
connectors for MCC–DO use: Single and Dual. The connections can be
made with standard ethernet cables. The MCC–DO card provides for
three MCC–DO span lines (See Figure 4-49). Refer to 1X EV–DO
Hardware Installation manual – 68P09257A95 for further information.
4