User's Manual

Index – continued
Jun 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU Index-5
DRAFT
test cable calibration, 1-16
Restore Carrier Signaling Operations for a Circuit
BTS, 10-29
Restore Carrier Signaling Operations for a Packet
BTS, 10-59
Restore Carrier Signaling Operations Procedure For a
Circuit BTS, Starting Up, 10-29
Restore Carrier Signaling Operations Procedure For a
Packet BTS, Starting Up, 10-59
Restore Sector Signaling Operations for a Circuit
BTS, 10-26
Restore Sector Signaling Operations for a Packet
BTS, 10-56
Restore Sector Signaling Operations Procedure For a
Circuit BTS, Starting Up, 10-26
Restore Sector Signaling Operations Procedure For a
Packet BTS, Starting Up, 10-56
Restore Site Signaling Operations for a Circuit BTS,
10-23
Restore Site Signaling Operations Procedure For a
Circuit BTS, Starting Up, 10-23
Restore Site Signaling Operations for a Packet BTS,
10-53
Restore Site Signaling Operations Procedure For a
Packet BTS, Starting Up, 10-53
RF
attenuator, 1-20
load for required test equipment, 1-20
required test equipment load, 1-20
test cable, 1-20
RF path calibration. See Bay Level Offset calibration
Rho
TX waveform quality acceptance test, 7-14
waveform quality requirements, 7-14
ROM code
described, 6-36
downloading, C-1
procedure, C-2
RS232 GPIB Interface Box, B-16
RS232 to GPIB interface, required test equipment,
1-18
RX
acceptance tests, FER, 7-21
sensitivity/frame error rate, 7-10
S
Selecting Test Equipment, 6-66
Set–up for TX Calibration, 6-81
Setting Cable Loss Values, 6-73
Setting TX Coupler Loss Value, 6-74
Shut Down Carrier Signaling Functions for a Circuit
BTS, 10-16
Shut Down Carrier Signaling Functions for a Packet
BTS, 10-46
Shut Down Carrier Signaling Functions Procedure
For a Circuit BTS, Shutting Down, 10-16
Shut Down Carrier Signaling Functions Procedure
For a Packet BTS, Shutting Down, 10-47
Shut Down Sector Signaling Functions for a Packet
BTS, 10-39
Shut Down Sector Signaling Functions for a Circuit
BTS, 10-9
Shut Down Sector Signaling Functions Procedure For
a Circuit BTS, Shutting Down, 10-9
Shut Down Sector Signaling Functions Procedure For
a Packet BTS, Shutting Down, 10-40
Shut Down Site Signaling Functions for a Circuit
BTS, 10-3
Shut Down Site Signaling Functions for a Packet
BTS, 10-32
Shut Down Site Signaling Functions Procedure For a
Circuit BTS, Shutting Down, 10-3
Shut Down Site Signaling Functions Procedure For a
Packet BTS, Shutting Down, 10-33
signal generator, 1X FER acceptance test, 7-4
Site, equipage verification, 6-6
Site equipage, CDF/NECF, 6-5
Software Release caveats, 8-1
Span line, J1 verification equipment, optional test
equipment, 1-21
Spectral purity, TX mask – primary and redundant
BBX, 7-9
Spectral purity transmit mask, acceptance test, 7-11
Spectrum analyzer, optional test equipment, 1-21
Supported Test Sets, 6-51
System Connectivity Test, B-21
T
T1, isolate BTS from the T1 spans, 6-16