User's Manual
Index – continued
Index-4 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU Jun 2004
DRAFT
LIF, Load Information File, 6-10
LMF, B-17 , B-22
1X FER acceptance test, 7-4
1X upgrade preparation, home directory, 6-9
BTS connection, 6-17
to BTS connection, 6-16
TX acceptance tests, 7-4
view CDF information, 6-6
LMF BTS displays, 6-19
LMF Removal, 8-4
Load Information File, 6-10
Logging Into a BTS, 6-25
Logging Out, 6-28
M
Motorola CyberTest GPIB Address, B-13
Multi Channel Card. See MCC
N
National Instruments, GPIB–232–CT or equivalent,
required test equipment, 1-18
NECF, 6-5
North American, cellular telephone system frequency
spectrum, CDMA allocation, 1-11
O
OMCR CLI access procedure, 10-2
Online Help, 6-32
Optional, test equipment list, 1-21
Optional test equipment
CDMA subscriber mobile or portable
radiotelephone, 1-21
frequency counter, 1-21
LAN tester, 1-21
oscilloscope, 1-21
RF test cable, 1-21
spectrum analyzer, 1-21
Oscilloscope, optional test equipment, 1-21
P
PCMCIA, Ethernet adapter, LMF to BTS connection,
6-17
Pilot time offset, acceptance test, 7-16
Ping, 6-33
Policy, required test equipment, 1-16
Power Meter, setting GPIB address, HP437B, B-14
Power meter
required test equipment, 1-19 , 1-20
TX acceptance tests, 7-4
Pre–calibration, HP 437, B-29
Preliminary operations, cell Site types, 6-1
Prepare to leave site
connect BTS E1/T1 spans, 8-4
connect BTS T1/E1 spans, 8-4
Prepare to Leave the Site
External Test Equipment Removal, 8-3
Final Checks before leaving site, 8-5
LMF Removal, 8-4
Re–connect BTS T1 spans, 8-4
Prerequisites, automated acceptance tests, 7-2
Procedures to Copy CAL Files From Diskette to the
CBSC, 8-2
Procedures to Copy Files to a Diskette, 8-1
R
RAM code, described, 6-36
Re–connect BTS T1 Spans, 8-4
receive path, calibration, 6-76
component verification, 6-76
Reduced ATP, 7-1
Report generation, ATP report, 7-23
Required test equipment
calibration, 1-16
communications system analyzer, 1-18
digital multimeter, 1-21
equipment warm–up, 1-16
GPIB cables, 1-19
high–impedance conductive wrist strap, 1-20
list, 1-17
optional equipment, 1-21
policy, 1-16
power meter, 1-19 , 1-20
RF adaptors, 1-20
RF attenuator, 1-20
RF load, 1-20
RS232 to GPIB interface, 1-18