User's Manual

Test Equipment Connection, Testing, and Control – continued
B-24 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU Jun 2004
DRAFT
Figure B-16 shows the connections when using an external 10 MHz
Rubidium reference.
SERIAL I/O
GPIB
CONNECTOR
ADVANTEST R3465
REAR PANEL
FROM 10 MHZ
RUBIDIUM REFERENCE
LOCAL IN
SERIAL I/O
IF OUT
SYN REF IN
10 MHZ OUT
PARALLEL
EXT TRIGGER
10 MHZ REF
GATE IN
GPIB
CDMA CLOCK OUT
AC POWER
AC POWER
R3465/3463
REAR PANEL
R3561L
REAR PANEL
TO T–CONNECTOR
ON FRONT PANEL
(EVEN SEC/SYNC IN)
X
YZ
421 MHZ
TO POWER METER
GPIB CONNECTOR
TO GPIB
INTERFACE BOX
FW00371
Figure B-16: Cable Connections for Test Set with 10 MHz Rubidium Reference
R3465 GPIB Clock Set–up
Table B-18 describes the steps to set the clock for the Advantest R3465
equipment.
Table B-18: Advantest R3465 Clock Setup
Step Action
1 Observe the current date and time displayed in upper right of the CRT display.
2 If the date and time are incorrect, perform the following to change them:
2a Push the Date/Time CRT menu key.
2b Rotate the vernier knob to select and set.
2c Push the vernier knob to enter.
2d Push the SHIFT then PRESET pushbutton (just below the CRT display).
B