User's Manual

Basic Troubleshooting – continued
11-8 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU Jun 2004
DRAFT
Table 11-9: Troubleshooting Device Enable (INS) Failure
Step Action
5 BBXs should not be enabled for ATP tests.
6 If MCCs give “invalid or no system time,” verify the CSA is enabled.
7 Log out of the BTS, exit the LMF, restart the application, log into the BTS, and re–attempt
device–enable actions.
cCLPA Errors
Table 11-10: cCLPA Errors
Step Action
1 If cCLPAs give continuous alarms, cycle power with the applicable DC PDA circuit breakers.
2 Establish an MMI session with the cCLPA (Table 6-11), connecting the cable to the applicable MMI
port.
2a Type alarms at the HyperTerminal window prompt and press Enter.
–– The resulting display may provide an indication of the problem.
2b Call Field Support for further assistance.
11