User's Manual
Basic Troubleshooting – continued
11-8 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU Jun 2004
DRAFT
Table 11-9: Troubleshooting Device Enable (INS) Failure
Step Action
5 BBXs should not be enabled for ATP tests.
6 If MCCs give “invalid or no system time,” verify the CSA is enabled.
7 Log out of the BTS, exit the LMF, restart the application, log into the BTS, and re–attempt
device–enable actions.
cCLPA Errors
Table 11-10: cCLPA Errors
Step Action
1 If cCLPAs give continuous alarms, cycle power with the applicable DC PDA circuit breakers.
2 Establish an MMI session with the cCLPA (Table 6-11), connecting the cable to the applicable MMI
port.
2a – Type alarms at the HyperTerminal window prompt and press Enter.
–– The resulting display may provide an indication of the problem.
2b – Call Field Support for further assistance.
11