User's Manual
Prepare to Leave the Site68P09258A31–A
Oct 2003
1X SCt 4812T BTS Optimization/ATP
5-11
Table 5-8: Reset BTS Devices and Remote Site Initialization
Step Action
5 Packet BTS procedure:
5a From the BTS site, contact the OMC–R and request the operator to PREACTIVATE the BTS to the
required software version for the BSS. There are two types of PREACTIVATE load processes:
– Rolling Upgrade: This load process is only available when the BTS cards are populated for full
redundancy as applicable.
– Quick Reboot: This process is used when there is not full redundancy for the BTS cards. The
GLI3 will disable and reboot to the new load. This will cause all the other cards to go out of
service. Once it is rebooted, the GLI3 determines which cards require a new load and then
downloads the cards in the order which they establish communication with the GLI3 following
their reboot. The GLI3 can reload up to 16 devices simultaneously.
6 After all activities at the site have been completed, contact the OMC–R and confirm that the BTS is
under OMC–R control.
5