User's Manual
Alarms Testing68P09258A31–A
Oct 2003
1X SCt 4812T BTS Optimization/ATP
3-121
Figure 3-31: Alarm Connector Location and Connector Pin Numbering
ÂÂÂÂÂÂÂ
ÂÂÂÂÂÂÂ
ÂÂÂÂÂÂÂ
ÂÂÂÂÂÂÂ
ÂÂÂÂÂÂÂ
ti-CDMA-WP-00041-v01-ildoc-ftw
59
1
60
2
59
1
60
2
Purpose
The following procedures verify the customer defined alarms and relay
contacts are functioning properly. These tests are performed on all AMR
alarms/relays in a sequential manner until all have been verified. Perform
these procedures periodically to ensure the external alarms are reported
properly. Following these procedures ensures continued peak system
performance.
Study the site engineering documents and perform the following tests
only after first verifying that the AMR cabling configuration required to
interconnect the BTS frame with external alarm sensors and/or relays
meet requirements called out in the SC 4812T Series BTS Installation
Manual.
NOTE
Motorola highly recommends that you read and understand this
procedure in its entirety before starting this procedure.
Test Equipment
The following test equipment is required to perform these tests:
S LMF
S Alarms Test Box (CGDSCMIS00014) –optional
Abbreviations used in the following figures and tables are
defined as:
S NC = normally closed
S NO = normally open
S COM or C = common
S CDO = Customer Defined (Relay) Output
S CDI = Customer Defined (Alarm) Input
NOTE
3