User's Manual

Index
68P09258A31–A
1X SCt 4812T BTS Optimization/ATP
Oct 2003
Index-2
Numbers
10BaseT/10Base2 Converter, 1-8
LMF to BTS connection, 3-17
1700 MHz Center Frequencies, Calculating, E-8
1700 MHz PCS Channels, E-7
1900 MHz Center Frequencies, Calculating, E-3
1900 MHz PCS Channels, E-2
2–way Splitter, 1-11
3C–PC–COMBO CBL, 1-8
800 MHz CDMA Channels, E-5
800 MHz Center Frequencies, Calculating, E-5
A
ACTIVE LED
GLI2, 6-23
MCC, 6-27
Advantest R3267 Spectrum Analyzer GPIB Address,
F-8
Advantest R3465, 3-57
Calibrating Test Cable, F-24
Advantest R3465 Communications Test Set GPIB
Address, F-12
Advantest R3562 Signal Generator GPIB Address,
F-9
Agilent 8935 Series E6380 (formerly HP 8935) Test
Set GPIB Address, F-10
Agilent E4406A, calibration, F-27
Agilent E4406A Transmitter Tester GPIB Address,
F-6
Agilent E4432B Signal Generator GPIB Address, F-7
Alarm Connector Location/Pin Numbering SC
4850/4850E, 3-121
ALARM LED, GLI2, 6-23
Alarm Monitor window, 3-120
alarm redundancy tests, BBX2, 3-114
Alarm Reporting Display, 3-120
Alarm tests, redundancy, 3-109
Alarm/Redundancy Tests, Distribution Shelf, 3-113
All Cal/Audit procedure, 3-92
All Cal/Audit Test, 3-97
AMR, No control, 6-17
AMR CDI Alarm Input Verification, test data sheets,
A-18
Ancillary Equipment Frame identification, 1-15
Ancillary frame, when to optimize, C-2
Antenna Map, 3-104
ATP, 4-2
generate report, 4-16
Report, 4-16
test matrix/detailed optimization, C-3
Test Prerequisites, 4-5
Test Procedure, 4-9
Automated Acceptance Test Procedure, 4-2
B
Backplane DIP switch settings, 2-4
Bay Level Offset calibration failure, 6-7
BBX2
alarm redundancy tests, 3-114
Connector, 6-15
gain set point vs BTS output considerations, D-2
No control in the shelf, 6-17
BLO
Calibration, 3-85
Calibration Audit, 3-94
calibration data file, 3-86
Calibration Failure, 6-7
Download, 3-94
BTS
Ethernet LAN interconnect diagram, 3-33
LMF connection, 3-16, 3-17
system software download, 3-4
test data sheets, redundancy/alarm tests, A-17
when to optimize, C-2
BTS frame
DC Distribution Pre–test, 2-10
DC Power Pre–test, 2-8
initial power–up, 2-15
BTS login, GUI environment, 3-26
BTS router communication session, establishing, J-6
BTS router connections, programming, J-7
Create CAL File, 3-98
C
C–CCP Backplane, Troubleshooting, 6-14, 6-15