User's Manual

BTS Redundancy/Alarm Testing
68P09258A31–A
Oct 2003
1X SCt 4812T BTS Optimization/ATP
3-110
Test Equipment Setup
Follow the procedure in Table 3-50 to set up test equipment:
NOTE
All alarm tests are performed using TX antenna 1
Table 3-50: Test Equipment Setup for Redundancy/Alarm Tests
Step Action
1 Interface the LMF computer to the BTS LAN A connector on
the BTS frame (refer to Table 3-5, page 3-17).
2 Login to the BTS.
3 Set up test equipment for TX Calibration at TXOUT1 (see
Figure 3-16).
NOTE
If site is not equipped for redundancy, remove all GLI and
BBX boards installed in any redundant slot positions at this
time.
4 Display the alarm monitor by selecting Util>Alarm Monitor.
5 Unequip all customer defined AMR alarms reported via the
AMR Alarm connector (A & B) by clicking on MGLI, then
selecting Device>Set Alarm Relays>Unequipped.
NOTE
During configuration of MGLI alarm reporting, spurious
alarms may report. Allow the BTS to stabilize for 10 seconds.
If any alarms are actively being reported after the BTS has
stabilized, determine the cause before proceeding further.
3