User's Manual
Table Of Contents
- Contents
- Chapter 1 Introduction
- Chapter 2 Preliminary Operations
- Chapter 3 Optimization/Calibration
Required Documentation
68P09258A31–A
Oct 2003
1X SCt 4812T BTS Optimization/ATP
1-12
Required Documentation
Required Documents
The following documents are required to perform optimization of the
cell site equipment:
S Site Document (generated by Motorola Systems Engineering), which
includes:
– General Site Information
– Floor Plan
– RF Power Levels
– Frequency Plan (includes Site PN and Operating Frequencies)
– Channel Allocation (Paging, Traffic, etc.)
– Board Placement
– Site Wiring List
– CDF or NECF files (bts–#.cdf or bts–#.necf and cbsc–#.cdf)
S Demarcation Document (Scope of Work Agreement)
S Equipment manuals for non-Motorola test equipment
Related Publications
Additional, detailed information about the installation, operation, and
maintenance of the SC4812T BTS and its components is included in the
following publications:
S BTS Frame Installation Manual; 68P09226A18
S 1X SC 4812T BTS Hardware Installation ; 68P09258A55
S 1X SC 4812T BTS FRU Guide ; 68P09258A64
S CDMA LMF Operator’s Guide; 68P64114A78
S CDMA RFDS Hardware Installation manual; 68P64113A93
S CDMA RFDS User’s Guide, 68P64113A37
S LMF CLI Commands, R16, 68P09253A56
1