User Manual

Scope, Assumptions, and Audience – continued
5/21/04 1X SC4812T–MC BTS Optimization/ATP 1-9
DRAFT
Assumptions
This document assumes that the BTS frames and cabling have been
installed according to the following manuals:
S SC Product Family Frame Mounting Guide, which covers the physical
“bolt down” of all SC series equipment frames
S 1X SC 4812T-MC BTS Hardware Installation , which covers BTS
specific cabling configurations for Packet Backhaul and the addition
of carriers to the BTS
Audience
Motorola Technical Information Products and Services (TIPS) has
attempted to incorporate into this document the many customer
suggestions and inputs received since the inception of the SC product
line. At the same time, TIPS has tried to ensure that the scope of the
document targets both the novice and expert site technician and
engineer with the information required to successfully perform the
task at hand. If, in some areas, the manual seems to cover the subject in
too much or not enough detail, please keep this in mind.
Intended Reader Profile
The information in this manual set is intended for use by the cellular
communications craftsperson(s) in the initial installation and
configuration, as well as the day-to-day operation and maintenance of a
BTS.
The user of this information has a general understanding of telephony, as
used in the operation of the Public Switched Telephone Network
(PSTN), and is familiar with these concepts as they are applied in the
cellular and maintenance mobile/portable radiotelephone environment.
The user also needs a working knowledge of MSr Windows# 98$or
Windows 2000%.
1