User Manual

Overview – continued
2-2 1X SC4812T–MC BTS Optimization/ATP 5/21/04
DRAFT
Initial Installation of
Boards/Modules
Follow the procedure in Table 2-1 to verify the initial installation of
boards/modules.
Table 2-1: Initial Installation of Boards/Modules
Step Action
1 Refer to the site documentation and install all boards and modules into the appropriate shelves as
required. Verify they are NOT SEATED at this time.
NOTE
The Switch Card has a configuration switch that must match the site configuration (see Figure 2-1).
2 As the actual site hardware is installed, record the serial number of each module on a “Serial Number
Checklist” in the site logbook.
Configuration Switch in Figure 2-1 shown for 3 Sector
Multicarrier BTS. (Switches 1 and 4 control configuration)
For Multicarrier, switch 1 should be Down; switch 4
depends on whether the frame supports 3 or 6 sector.
NOTE
2