User Manual
Test Equipment Set Up – continued
3-54 1X SC4812T–MC BTS Optimization/ATP 5/21/04
DRAFT
Equipment Warm-up
Warm-up BTS equipment for a minimum of 60 minutes
prior to performing the BTS optimization procedure. This
assures BTS site stability and contributes to optimization
accuracy. (Time spent running initial power-up,
hardware/firmware audit, and BTS download counts as
warm-up time.)
NOTE
Before installing any test equipment directly to any BTS
TX OUT connector, verify there are NO CDMA BBX
channels keyed. At active sites, have the OMC-R/CBSC
place the antenna (sector) assigned to the PA under test
OOS. Failure to do so can result in serious personal injury
and/or equipment damage.
WARNING
Automatic Cable Calibration
Set–up
Figure 3-13 and Figure 3-14 show the cable calibration setup for various
supported test sets. The left side of the diagram depicts the location of
the input and output ports of each test set, and the right side details the
set up for each test.
Manual Cable Calibration
If manual cable calibration is required, refer to the procedures in
Appendix F.
3