User Manual
Using the LMF – continued
5/21/04 1X SC4812T–MC BTS Optimization/ATP 3-25
DRAFT
Table 3-6: BTS GUI Login Procedure
n ActionStep
8 Click on Ping.
– If the connection is successful, the Ping Display window shows text similar to the following:
Reply from 128 128.0.0.2: bytes=32 time=3ms TTL=255
– If there is no response the following is displayed:
128.0.0.2:9216:Timed out
If the MGLI fails to respond, reset and perform the ping process again. If the MGLI still fails to
respond, typical problems are shorted BNC to inter–frame cabling, open cables, crossed A and B
link cables, missing 50–Ohm terminators, or the MGLI itself.
9
Change the Multi-Channel Preselector (from the Multi-Channel Preselector pick list) selection,
normally MPC, to correspond to the BTS configuration, if required.
NOTE
When performing RX tests on expansion frames, do not choose EMPC if the test equipment is
connected to the starter frame.
NOTE
“Use a Tower Top Amplifier” is not applicable to the SC4812T–MC.
10
Click on Login.
A BTS tab with a graphical representation of the BTS CCP cage is displayed.
NOTE
S If login is attempted to a BTS that is already logged on, all devices will be gray.
S For Software Release 2.16.4.0 and earlier, a Mode Selection box asking if the BTS is Trunked
or Multicarrier will pop up. Multicarrier must be selected for the SC4812T–MC BTS.
S There may be instances where the BTS initiates a log out due to a system error (than is, a device
failure).
S If the MGLI is OOS_ROM (blue), it will have to be downloaded with code before other devices
can be seen.
S If the MGLI is OOS_RAM (yellow), it must be enabled before other installed devices can be
seen.
BTS Login from the CLI Environment
Follow the procedure in Table 3-7 to log into a BTS when using the CLI
environment.
3