User Manual
Test Equipment Preparation
5/21/04 1X SC4812T–MC BTS Optimization/ATP F-1
DRAFT
Purpose
Pre–testing set–up information covered includes verification and setting
GPIB addresses, inter–unit cabling, connectivity testing, pre–test control
settings, and equipment calibration for items which are not calibrated
with the Calibrate Test Equipment function of the LMF.
The following procedures include verification and changing GPIB
addresses for the various items of CDMA test equipment supported by
the LMF.
Prepare test sets
This appendix provides information on pre–testing set–up for the
following test equipment items (not required for the Cybertest test set):
S Agilent E7495A test equipment set–up
S Agilent E4406A transmitter test set
S Agilent E4432B signal generator
S Advantest R3267 spectrum analyzer
S Advantest R3562 signal generator
S Agilent 8935 analyzer (formerly HP 8935)
S HP 8921 with PCS interface analyzer
S Advantest R3465 analyzer
S Motorola CyberTest
S HP 437 power meter
S Gigatronics 8541C power meter
S GPIB adapter
Test Equipment Set-up
S HP8921A System Connectivity Test
S HP PCS Interface Test Equipment Setup for Manual Testing
S Calibrating Test Cable Set–up using Advantest R3465
Calibrating test sets
S Agilent E4406A Transmitter Tester Self-alignment (Calibration)
S HP 437 Power Meter (Calibration)
S Gigatronics 8542 power meter (Calibration)
Agilent E7495A Test Equipment
Setup
This test equipment requires a warm-up period of at least 30 minutes
before BTS testing or calibration begins.
Using the Agilent E7495A with the LMF
The Agilent E7495A does not require the use of the 19MHz frequency
reference; if connected, it will be ignored. The Even Sec SYNC
connection is required.
F