User Manual
FRU Optimization/ATP Test Matrix – continued
5/21/04 1X SC4812T–MC BTS Optimization/ATP C-3
DRAFT
When the MCIO is replaced, the C–CCP shelf remains powered up. The
BBX boards may need to be removed, then re–installed into their
original slots, and re–downloaded (code and BLO data). RX and TX
calibration audits should then be performed.
C