Prepare to Leave the Site
5-4 1X SC4812T–MC BTS Optimization/ATP 5/21/04
DRAFT
External Test Equipment
Removal
Perform the procedure in Table 5-3 to disconnect the test equipment and
configure the BTS for active service.
Table 5-3: External Test Equipment Removal
Step Action
1 Disconnect all external test equipment from all TX and RX
connectors on the top of the frame.
2 Reconnect and visually inspect all TX and RX antenna feed
lines at the top of the frame.
Verify that all sector antenna feed lines are connected to
the correct ports on the frame. Crossed antenna cables will
cause system degradation of call processing.
CAUTION
Each module or device can be in any state prior to
downloading. Each module or device will be in an
OOS_RAM state after downloading has completed.
S For all LMF commands, information in italics
represents valid ranges for that command field.
S Only those fields requiring an input will be specified.
Default values for other fields will be assumed.
S For more complete command examples (including
system response details), refer to the CDMA LMF User
Guide.
NOTE
BTS Site Span Configuration
Verification
Perform the procedure in Table 5-4 to verify the current Span Framing
Format and Line Build Out (LBO) parameters. ALL MGLI/GLI boards
in all C–CCP shelves that terminate a T1/E1 span should be verified.
5